Showing posts with label point 3 of unit 22 / M. Show all posts
Showing posts with label point 3 of unit 22 / M. Show all posts

Tuesday, 11 October 2011

Production review - unit 22 .3 - handmade portrait

Reviewing edit

Pre – production

The pre-production was very smooth running since I had ideas previously in my head in which I wanted to do. I started by researching into different types of biographical videos such as [Abberican me, the handmade portrait group on Vimeo and http://jorisdebeij.com/] I found the videos on http://www.theberrics.com {Abberican me} and http://jorisdebeij.com/ the most helpful as they where very much into the style I wanted to go for, this includes following a subject around their local areas as I want them to feel comfortable in their natural surrounding.

After research I looked into locations for which to place interviews and film them do their chosen talent. I also tough of back up locations in which would be used if a problems were to occur such as wind/rain and loud noise.

Once completing these I wrote down my final ideas including research into videos in which I would like my project to emulate in a minor degree [Chaz Ortiz – Abberican me]

After these three main pieces were completed I finished of the remaining documents [call sheet, productions logs, health and safety assessment, budget sheet, treatment and treatment budget.

Treatment

The treatment overviews the entire production ideas and process including the suggested elements and what you want your video to provoke.

Production

The production went very well with no critical issues [minor issues were, having to move location to gain better audio quality]

The production rate went smoothly and everything went to schedule, we even had time to film more footage of him travelling around the city which gave the video a homely touch personal to Elliot Maynard since he likes to search around his city [Nottingham] for new places to skate.

I decided to film the skateboarding in the city centre early evening when the sun begins to go down and you get very harsh shadows and low luminance from lights within the city which I would call natural lighting since I have no control over them. I chose to do this because this is a very nice way to represent Elliot and Nottingham to make the centre look peaceful and inviting. The low warm glow from the orange/yellow lights makes for great bokeh [bokeh – an effect that is shown in images out of focus areas, usually from the lights within the background of an image. The hexagon shape is created from the light entering the camera senor but first having to hit the aperture that would be this hexagon shape.] Which gives the footage a mellow, chilled out mood since the warm colours invite the viewer into the environment and giving them a sense of being there. This is called documentary realism – the present effect it usually involves cinema techniques such as hand held use of camera, following the action and natural lighting ‘like I said beforehand’. These techniques are not only used in these locations but throughout the film but the Nottingham city centre is where they are most dominant.

post-production

The First shots where edited in a montage style showing multiple locations in one scene which is non-linear to give the viewer and introduction to who Elliot Maynard is and what he does. The scene involves his travelling around the city, skateboarding within the city and hanging around with friends. The final shot shows him do a trick in front of Nottingham market square building to show him in front of his local monument, the video then cuts on beat with text revelling his name, the name of the video and the first question where are you from? I believe this form of match on action [editing cuts on beat] adds impact to the build up of the big moment when the actual documentary begins. The music is a big part of my film as I believe it helps to link with the style of person Elliot is; young, upbeat and active. The long beat a the beginning is used to lengthen out the wait to make people anxious about when the video is going to start this is a good way of creating tensions which provokes the audiences mind into wanting to see the video even more.

Saturday, 8 October 2011

Production - camera log sheet - unit 22 .3 - handmade portrait

Production log - unit 22 .3- Handmade portrait - 01/10/2011

Production log - Production – 02/10/2011

Today I filmed all of the footage needed for my video, the shoot went well and fit in with the planned schedule


Pros

  • schedule went to plan

  • footage turned out great

  • weather stayed good no rain at all

  • Talent turned up on time and was happy to answer any questions


Cons

  • wind outside was ruining audio [had no choice but to film interview inside a car park which echoed]


Reflection of the day

what happened

everything went well apart from audio issue which was resolved but not to plan.

Feelings

I felt annoyed of the audio/wind issue but was grateful for having a back up location very close.

Evaluation

I learned from a previous encounter with the same issue that having a back up location is the best thing available.

Action plan

Book out a dead-cat cover to help reduce wind noise

Book out another microphone to record the audio separate from behind some sort of wind shield.


paperwork completed

  • camera log sheet


Production log - unit 22 .3 - handmade portrait - 01-10-2011

Production log - Pre - Production – 1/10/2011


completed -

  • call sheet

  • location recce

  • risk assessment


I believe I did these three piece of work to late as the shooting date was the next day but I was lucky to have been meeting up with Elliot anyway to help him finish of another video so it all fit in nicely.

Production log - unit 22 .3- Handmade portrait - 30/9/2011

Production log - Pre - Production – 30/9/2011


completed -

  • Research into handmade portrait videos and their techniques [Beatz and Chaz Ortiz]

  • Ideas – into handmade portrait

  • treatment / treatment budget

  • budget sheet

  • call sheet



All work went smoothly have multiple ideas straight away although finding people to do it was hard as I wanted to do something different from what I normally do.

Tuesday, 20 September 2011

Reviewing edit /evaluation - Local tour - Unit 22

Reviewing edit /evaluation

Local tour – Vimeo – unit 22

Day 1 September - September 19th 2011

During day 1 I captured all the footage/footage of my card.

I then opened up Final Cut Studio and tested out a few pieces of music to a rough edit. I then began to put my footage into the timeline and edit, i found that allot of the footage i filmed was not going to be used so i went through and chose the footage with the most meaning. I.e.: the boy looking over the wall at the water fall, i thought it was great how people come to look over at the waterfall and relax. i kept the sound of the water rather loud to represent a persons problems being cleansed or washed away.

Another shot i chose to keep becuase of meaning was the very first "Derby wheel shot" i like to think it represented the cycle of a daily night in Derby i tried to make this clear throughout the video by using 'Derby big wheel' shots continuous as the video progressed as if the video was the entire length of the night.

During the production my only memory card fast enough for recording footage filled up and i wanted to go out and get some last minute shots. i then came across this video

and thought how brilliant light-drawing looks as video and how interesting it is to show people around a location, i then got my camera and took multiple long exposures from the same position to create 'moving image'.

whilst editing i used two of these types of video-drawings. the first one was to introduce people into the city as the lines of the road represent travelling, entering / the fast paced blurry lines made the shot look calm and exciting as people are when going out during the night. The second use of this technique was to show people being unaware of things around them [being drunk] or the night has gone so fast and they've enjoyed it so much it's all been a blur, i added sound effects of traffic to represent people going home and getting in other peoples way after a night out.


The final shots are time-lapse of the main intercity-traffic junction represent people coming and going into the city as if it happened so quickly, i also used ramping [gradually slowing and speeding up footage] to give the shot a very unusual look and make out that things are very unique during night time.

The final shot of the Taxi's is to exit the video as people genuinely use this mode of transport to get back home and i felt was a good way to show this as there was more than one taxi as if the drivers are waiting as it's there normal daily routine.


Music

i chose a mixed beat piece of music as it was made by a documentary composer called Simon Wilkinson - this particular piece of music has very Blade Runner Type dramatic beats and ambient hums which i think is perfect for a night time based exterior video as it gives the calm but mildly dramatic ambience which is usually the connotations with night time based films.

i also like how the song has beats which happen only now and again as i gives the video suspense and randomness which lines up with how a persons night out may happen.

The use of slow cuts and slow music is to allow people who have never seen the city before get and understanding of where things are, this is why i used the 'Big wheel' as a symbolic icon of central and allow people to reference how far or close they are away from shot locations.

Production log- unit 22 .3- local tour - 20/09/2011

Completed - Edit of Video [local tour] took approximately 5hrs to capture/edit/colour correct

Completed - review of Edit

Sunday, 18 September 2011

Production log/shoot Review- unit 22 .3- local tour - 16/9/2011


Production log/Shoot Review - unit 22 - local tour- 16/9/2011


in-day log- 11am-4pm


Completed – Story boards

Completed – locations timetable

Completed – Equipment checks


Evening-night log- 5pm-10pm


Completed – Friday night footage shoot

Completed - shooting records [on set log sheet]


Review of 16/09/2011 – 5pm/10pm shoot


Positive points


The shoot went well during the times [5pm -7pm] with only light showers as the weather report predicted. Although there was a time when it got heavier and had to stop shooting for a while.


The locations turned out better than expected as there was a few evening events going on in the square/quad such as the Derby Big-wheel which I didn't know was in town, which made a lot of the shoots look more interesting as it represented how far away from the centre I was as well as how active the central area was, this helped my theme of inner and outer city more visual to the audience.


The other location that was more interesting than what I was expecting was the Derwent river which had a good representation of division between the inner and outer city as one side was more simple with trees and walkways while the other was busy with construction sites, larger buildings, bright lights and more people.


As the evening got darker it allowed me to get more interesting shots since the bright lights within the city stood out more and gave the footage a mellow/exciting mood. This is a good way of showing the entertainment venues at their peak because most of them only open in the evening or at night.


Negative points


The only problem within the night was most of the venues don't start to gather people until after 8/9pm so it was hard fining ones where people begun to populate, I wanted a large amount of people to gather around evening venues to make the city look like it was busy/faced paced and popular at night, although I did try to combat the lack of people by shooting the same location from multiple angles and using two shots one being and establishing shot and the other a close up of the venue and people, these techniques helped give the illusion that there were more people just by the use of using two shots instead of one.



Tuesday, 13 September 2011

Production log - unit 22 .3 - local tour - 13/9/2011

Production log - unit 22 - local tour- 13/9/2011

- completed - treatment
- completed- treatment budget
-completed - All ideas


---Alternative production log----

-checked weather forecast which may alter which days were originally planned for shooting.

Monday, 12 September 2011

(production log) unit 22 .3 - local tour - 12/9/2011

Production Log - Task 22 – [begun] 12/09/2011


12/09/2011- Begun assignment done research into – Vimeo Local Tour – videos and equipment Contingency plans.

completed a Contingency plan/research into more local tour films